CL Joinery have vast experience in the refurbishment of existing bathrooms and also the installation of complete new bathroom. We have ongoing relationships with local bathroom specialists such as Castlewater, so can provide full solutions to match any budget or requirement.
The first slideshow is of images displaying the existing bathroom with everything removed
The second slideshow is of images displaying the start of the renovation including the replacement of the previous flooring from floorboards to 6mm boarding . The flooring was been replaced due to previous water damage , but another plus point with replacing flooring from floorboards to sheets of 6mm rectified the issue with squeaking floorboards in the bathroom
The third slideshow is off images showing the completed bathroom
All the wall tiling was sub-contracted to a local professional tiler to ensure the customer got a premium finish to the tiling. The x2 walls which required tiling was completed across x2 days by GW Bathrooms & Interiors . More of their work can be viewed via the link below
Testimonial for above work
Craig has just completed a full bathroom renovation including a new floor, re-plastered walls and ceiling and all new fittings and a walk in shower enclosure. Work was done to a high standard in the time he stated and now looks fantastic. On arrival work was done non-stop ,and his experience and knowledge was well appreciated. I would highly recommend.
You must be logged in to post a comment.