B & Q Kitchen Cabinets

B & Q Kitchen Cabinet Fitter – Day 1

CL Joinery are your local B & Q Kitchen Fitter . Below is a portfolio of a recent kitchen installation capturing the progress of the work.

Images taken from 1st day of kitchen installation using units from B & Q , these are standard units direct off the shelf . All units come flat pack and require building each base unit or wall cabinet individually. All units come with all possible holes already drilled and provided with all screws needed to build each unit direct out of the box , only item missing which is preferable is tube of glue to help strengthen the joints

 

B & Q Kitchen Cabinets installed by CL Joinery – Day 2

Day 2 – Continuing the installation of the B & Q Kitchen Cabinets , all base units now in correct positions and wall cabinets hung –

Main objective of Day 2 is installation of worktops and the decorative kitchen units end panels

So from previous day work

Day 3- Continuing the installation of the B & Q Kitchen Cabinets , all base units now in correct positions and wall cabinets hung – main objective of Day 3 is fully completing the kitchen , this includes attaching all door handles , installing rest of the end panels , installing the upstart on top of all the Worktops and finally the plinths underneath the base units
End of Day 3 the kitchen is complete